Operational security study project on ERTMS onboard developments

Target icon

Context and objectives

Within the ERTMS on-board team, the main task focused on drafting safety files.

Achievement icon

Achievements/Tasks

  • Production of a system and software safety file according to railway standards.
  • Analysis of system/software requirements and compliance with the standard
  • Carrying out safety analysis (preliminary study, critical code review)
  • Specific application
  • Validation of test scenarios (Unit, Integration and Validation)
  • Test coverage verification (recommendation of other tests if necessary)

results icon

Deliverables/Results

  • Response documents for calls for tenders (compliance templates, battery design, technical proposals, technical quote)
  • Test models, prototypes and tools 
  • Flight and qualification batteries
  • Technical documentation (User manuals, supporting documentation, test plans, analysis etc.)

Share